Skip to content
ABN 20 395 282 011SPEC AS-4419SEASON 2025/26SOUTH-EAST VICTORIAOFF THE TOOLS

Project 031 · South East Melbourne

Dry stone wall and pebble path

Retaining / Stone

Long dry stacked stone wall beside a cream pebble path with bluestone steppers.
Dry stone wall and pebble path before

Brief

A side path rebuilt as dry stacked stone with a pebble strip and bluestone steppers.

Challenge

Narrow access beside the deck. Drainage had to run the full length of the wall before capping.

Result

A clean stone edge that holds the bed and a path that sheds water off the decking.