Project 043 · South East Melbourne
Sleeper wall with gravel drainage
Retaining / Drainage

Brief
Sleeper retaining on steel posts with gravel drainage packed at the toe of the wall.
Challenge
The clay bank was still live. Drainage had to go in before backfill closed the face.
Result
A wall that holds the bank and a drainage strip that keeps water off the toe.